Welcome: Weiyu Plastic Mould and Product Ltd.  
lxwei@weiyumold.com +8613922546862

Home      Photo       Plastic Injection Molds


  • Plastic Injection Molds
  • Plastic Injection Molds
  • Plastic Injection Molds
  • Plastic Injection Molds
  • Plastic Injection Molds
  • Plastic Injection Molds
  • Plastic Injection Molds
  • Plastic Injection Molds
Plastic Injection MoldsPlastic Injection MoldsPlastic Injection MoldsPlastic Injection MoldsPlastic Injection MoldsPlastic Injection MoldsPlastic Injection MoldsPlastic Injection Molds
Product Description:
P20 H13 S136 Plastic Injection Molding , PE PVC ABS Plastic Hook Mould

 

Description:

Parts Material:Plastic injection molding grade, such as PE, PVC ABS, PC, PP, POM, PA6( PA66, GF filled), PMMA, PET(PBT).

Cav.& Cor. Material:P20, H13,S136, NAK80, 718, 2738, 2316, SKD61 etc;

Mold Base:LKM, DME, HASCO or Customize according to customers' requirements;

Cavity quantity: 1*1, 1+1, 1*2, 1+1+1, etc.    

Shot Runner:Cold or Hot Runner_ HASCO/DME/YUDO etc. 

Mold lifetime:100K to 1500k shots or according to customers quantity condition to decide it with saving cost for our customers. 

Soft wares: CAD/CAM/CAE, UG, Pro/E,  Powmill, Solid works etc.

 

Applications:

This product will be widely used on the construction industry, it is a Personal Protection Equipment, usually used for high sky building working.


Specifications:

1 . Communication→Customer Technical Representative→Content Requirement→Design People. Communication→Mold User→Use and Maintence→Design People. Communication→Customer Project

2 . Designing→Design based on new mold confirmation, and confirm with the customer

3 . purchasing and processing→purchase accirding to material sheet, process and assemble according to 2D/3D drawings, dimensional test of all parts to ensure a correct match with the drawing

4 . Authentication→trial production according to designed machine model and mold flow analysis,organize 3rd-party review, provide with the customers satisfied products/molds at earliest time.

5 . based on the above 4 steps, set up a project team and assign a project manager and a project director to follow up the case.

<1> . Project manager: to follow up the project and to communicate with customer

<2> . Project director: ensure development of the mold and the quality from technical point of view.

CATEGORIES

CONTACT US

Name: Mrs. wang

Mobile:+8613922546862

Whatsapp:+8613922546862

Email:lxwei@weiyumold.com

Add:Yang Wu Industial Zone, Dalinshan Town, Dongguan City, Guangdong Province, China

Leave a message

whatsapp

Email

Phone

Top